ValOre Reports Near-Surface High-Grade PGE Mineralization in Three Additional Drill Holes at Salvador Discovery, Pedra Branca Project; 46.05 m at 1.96 g/t 2PGE+Au from 77.15 m, including 10 m at 5.02 g/t 2PGE+Au
VANCOUVER, British Columbia, Oct. 17, 2023 (GLOBE NEWSWIRE) — ValOre Metals Corp. (“ValOre”; TSX‐V: VO; OTCQB:KVLQF; Frankfurt: KEQ0, “the Company”) today reported assay results from the Salvador Target (“Salvador”) as part of the 2023 Phase 1 drill program at ValOre’s 100%-owned Pedra Branca Platinum Group Elements (“PGE”, “2PGE+Au”) Project (“Pedra Branca”) in northeastern Brazil.
Related news for (KVLQF)
- CEO.CA’s Inside the Boardroom: ValOre Metals is Unlocking a District-Scale Metals Empire Through Merger
- ValOre Commences Geophysical Survey and Trenching Program
- ValOre Continues Trado® Drill and Trenching Exploration Programs at Salvador Target, Pedra Branca PGE Project, Brazil
- ValOre Metals Corp. Announces Voting Results of Annual General Meeting
- ValOre Provides Corporate and Project Update