Skyharbour Intersects 7.30% U3O8 over 3.0m within 5.0m of 4.61% U3O8 at High-Grade Moore Project and Plans for Upcoming Fully-Funded Summer Drill Programs
Vancouver, BC, July 11, 2024 (GLOBE NEWSWIRE) — Skyharbour Resources Ltd. (TSX-V: SYH) (OTCQX: SYHBF) (Frankfurt: SC1P) (the “Company”) is pleased to announce assay results from its 2024 winter diamond drilling program which totaled 2,864 metres in nine holes at its 100% owned, 35,705 hectare Moore Uranium Project. The project is located approximately 15 kilometres east of Denison Mine’s Wheeler River project and proximal to regional infrastructure for Cameco’s Key Lake and McArthur River operations in the Athabasca Basin, Saskatchewan. A highlight from this program was from hole ML24-08 which intersected 5.0 metres of 4.61% U3O8 from a relatively shallow downhole depth of 265.5 metres to 270.5 metres including 10.19% U3O8 over 1.0 metre at the Main Maverick Zone. Skyharbour plans to continue advancing Moore through additional drilling in 2024 in conjunction with a fully-funded summer drill program to follow-up on the recently reported Fork target uranium discovery at the Company’s adjacent Russell Lake Uranium Project. The combined drill campaign this summer is planned to consist of approximately 7,000 – 8,000 metres with details forthcoming.
Related news for (SYHBF)
- Skyharbour Signs Agreement to Sell a Portion of its Karin Uranium Property to Cosa Resources Corp.
- Skyharbour Drills New Discovery at Russell Project with High-Grade Uranium Mineralization Up to 3.0% U3O8 at Newly Identified Fork Zone; Preparing for Fully-Funded Summer Drill Program
- Skyharbour and JV Partner Orano Announce Completion of Geophysics and Upcoming Commencement of Field Program at Preston Uranium Project
- Skyharbour’s Partner Azincourt Completes Winter Drill Program at East Preston Uranium Project