Skyharbour Drills New Discovery at Russell Project with High-Grade Uranium Mineralization Up to 3.0% U3O8 at Newly Identified Fork Zone; Preparing for Fully-Funded Summer Drill Program
Vancouver, BC, July 09, 2024 (GLOBE NEWSWIRE) — Skyharbour Resources Ltd. (TSX-V:SYH) (OTCQB:SYHBF) (Frankfurt:SC1P) (the “Company”) is pleased to announce initial results from Phase One of its 2024 winter drill program at the 73,294 hectare Russell Lake Uranium Project (“Russell” or the “Project”). The Project is strategically located in the central core of the Eastern Athabasca Basin of northern Saskatchewan adjacent to regional infrastructure, including an all-weather road and powerline. Drilling at Russell was completed during two separate phases of drilling with a total of 3,094 metres drilled in six holes during Phase One with geochemical assays reported here. The second phase of the winter drill program at Russell consisted of 2,058 metres in four holes with the geochemical assays still pending and to be released at a later date. The Company also recently completed 2,864 metres of drilling in nine holes at its Moore Project with assays pending from that program.
Related news for (SYHBF)
- Skyharbour Signs Agreement to Sell a Portion of its Karin Uranium Property to Cosa Resources Corp.
- Skyharbour Intersects 7.30% U3O8 over 3.0m within 5.0m of 4.61% U3O8 at High-Grade Moore Project and Plans for Upcoming Fully-Funded Summer Drill Programs
- Skyharbour and JV Partner Orano Announce Completion of Geophysics and Upcoming Commencement of Field Program at Preston Uranium Project
- Skyharbour’s Partner Azincourt Completes Winter Drill Program at East Preston Uranium Project