Skyharbour Drills New Discovery at Russell Project with High-Grade Uranium Mineralization Up to 3.0% U3O8 at Newly Identified Fork Zone; Preparing for Fully-Funded Summer Drill Program

Vancouver, BC, July 09, 2024 (GLOBE NEWSWIRE) — Skyharbour Resources Ltd. (TSX-V:SYH) (OTCQB:SYHBF) (Frankfurt:SC1P) (the “Company”) is pleased to announce initial results from Phase One of its 2024 winter drill program at the 73,294 hectare Russell Lake Uranium Project (“Russell” or the “Project”). The Project is strategically located in the central core of the Eastern Athabasca Basin of northern Saskatchewan adjacent to regional infrastructure, including an all-weather road and powerline. Drilling at Russell was completed during two separate phases of drilling with a total of 3,094 metres drilled in six holes during Phase One with geochemical assays reported here. The second phase of the winter drill program at Russell consisted of 2,058 metres in four holes with the geochemical assays still pending and to be released at a later date. The Company also recently completed 2,864 metres of drilling in nine holes at its Moore Project with assays pending from that program.

Read more at globenewswire.com

Related news for (SYHBF)

NASDAQ and NYSE quotes and data are delayed 15 minutes unless indicated otherwise. Market data and exchange information are provided for informational purposes only and is not intended for trading purposes. Neither 24/7 Market News Editors, 247 Market News, or data and content providers shall be liable for any errors or omissions, delays, misquotes or other market information relayed in any press materials. You should Use Realtime data to conduct due diligence before investing or trading, and trading in any stock is risky you could lose all your money.