Sitka Gold Prepares Mobilization for a Winter Diamond Drilling Program at Its RC Gold Project, Yukon
VANCOUVER, BC, Jan. 4, 2024 /PRNewswire/ – Sitka Gold Corp. (“Sitka” or the “Company”) (CSE: SIG) (FSE: 1RF) (OTCQB: SITKF) is pleased to announce that it has secured a drilling contractor to complete winter and summer diamond drilling programs at its RC Gold Project (“RC Gold” or the “Project”) located in the prolific Tombstone Gold Belt in the Yukon. Preparation of crew and equipment is currently underway and mobilization for the winter drilling program is anticipated to begin next month.
Related news for (SITKF)
- Sitka Gold Intersects 25.0 Meters of 5.04 g/t Gold, Including 1.8 Metres of 54.70 g/t Gold Within 86.4 m of 1.65 g/t Gold at Its RC Gold Project, Yukon
- Sitka Gold Intersects 108.9 Metres of 3.27 g/t Gold Including 45.0 Metres of 4.52 g/t Gold Within 352.8 Metres of 1.55 g/t Gold at Its RC Gold Project, Yukon
- Sitka Gold Appoints Gilles Dessureau as Vice President of Exploration and Strengthens Its Technical Advisory Team
- Sitka Gold Signs 30,000 Metre Diamond Drilling Contract for 2025 at Its RC Gold Project, Yukon
- Sitka Announces $3 Million Private Placement Financing