Sitka Gold Intercepts 108.00 g/t Gold Over 1.2 Metres Within 4.15 g/t Gold Over 38.2 Metres at its RC Gold Project, Yukon
VANCOUVER, BC , Sept. 11, 2023 /PRNewswire/ – Sitka Gold Corp. (“Sitka” or the “Company”) (CSE: SIG) (FSE: 1RF) (OTCQB: SITKF) is pleased to announce the results of drill hole DDRCCC-23-46 (“Hole 46”), the fourth hole completed in the 2023 summer drilling program at the Blackjack deposit on the Company’s 376 square kilometre, road accessible RC Gold Project (“RC Gold” or the “Project”) located in Yukon’s Tombstone Gold Belt (“TGB”), approximately 100 kilometres east of Dawson City. A diamond drilling program of up to 10,000 metres (m) is currently underway at RC Gold.
Related news for (SITKF)
- Sitka Gold Intersects 25.0 Meters of 5.04 g/t Gold, Including 1.8 Metres of 54.70 g/t Gold Within 86.4 m of 1.65 g/t Gold at Its RC Gold Project, Yukon
- Sitka Gold Intersects 108.9 Metres of 3.27 g/t Gold Including 45.0 Metres of 4.52 g/t Gold Within 352.8 Metres of 1.55 g/t Gold at Its RC Gold Project, Yukon
- Sitka Gold Appoints Gilles Dessureau as Vice President of Exploration and Strengthens Its Technical Advisory Team
- Sitka Gold Signs 30,000 Metre Diamond Drilling Contract for 2025 at Its RC Gold Project, Yukon
- Sitka Announces $3 Million Private Placement Financing