Sitka Gold Drills 84.0 Metres of 1.21 g/t Gold From Surface 450 Metres East of the Blackjack Deposit at its RC Gold Project, Yukon
VANCOUVER, BC, Oct. 30, 2023 /PRNewswire/ – Sitka Gold Corp. (“Sitka” or the “Company”) (CSE: SIG) (FSE: 1RF) (OTCQB: SITKF) is pleased to announce the results of drill holes DDRCCC-23-048 through DDRCCC-23-054 (“Holes 048 to 054”), the 8th to 14th holes completed during the 2023 diamond drilling program at the Company’s 376 square kilometre, road accessible RC Gold Project (“RC Gold” or the “Project”) located in Yukon’s Tombstone Gold Belt (“TGB”), approximately 100 kilometres east of Dawson City (see Table 1). Analytical results for an additional 2 diamond drill holes completed at RC Gold are pending.
Related news for (SITKF)
- Sitka Gold Intersects 25.0 Meters of 5.04 g/t Gold, Including 1.8 Metres of 54.70 g/t Gold Within 86.4 m of 1.65 g/t Gold at Its RC Gold Project, Yukon
- Sitka Gold Intersects 108.9 Metres of 3.27 g/t Gold Including 45.0 Metres of 4.52 g/t Gold Within 352.8 Metres of 1.55 g/t Gold at Its RC Gold Project, Yukon
- Sitka Gold Appoints Gilles Dessureau as Vice President of Exploration and Strengthens Its Technical Advisory Team
- Sitka Gold Signs 30,000 Metre Diamond Drilling Contract for 2025 at Its RC Gold Project, Yukon
- Sitka Announces $3 Million Private Placement Financing