Lithium South Completes 400 Meter Pumping Well at Alba Sabrina
VANCOUVER, B.C., March 14, 2024 /PRNewswire/ — Lithium South Development Corporation (the “Company”) (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt: OGPQ) Lithium South Development is pleased to announce the completion of the first pumping well at the 2,089-hectare Alba Sabrina claim block located in Salta Province, Argentina. The Alba Sabrina claim is the largest of the five, salar located claim blocks which total 3,287-hectares of the 5,687-hectare Hombre Muerto North Lithium Project (HMN Lithium Project) package. Pumping well PW23-AS-02 has been completed to 400 meters of depth and has encountered sand layers as the dominant texture throughout. PW23 AS-02 has been piped and graveled in preparation for long term pumping tests, with a screen length of 207 meters.
Related news for (LISMF)
- LITHIUM SOUTH: TEST WORK/ DEVELOPMENT WORK /BUSINESS DEVELOPMENTS UPDATE
- Lithium South Development Corporation: Well Update – Corporate Site Visit – Private Placement to Close
- South American Lithium Projects Set to Flourish in Battery Metal’s Projected 2024 Rebound Year
- Preliminary Economic Assessment Filed on SEDAR
- Lithium South Development Corporation: Preliminary Economic Assessment Filed on SEDAR