Lithium South Announces PEA Estimate US$934 Million Dollar NPV with an IRR of 31.6% and a 2.5 year Payback for HMN Lithium Project

PEA HIGHLIGHTS

VANCOUVER, BC, March 4, 2024 /PRNewswire/ — Lithium South Development Corporation (the “Company” or “Lithium South”) (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt: OGPQ) is pleased to announce positive results from an independent Preliminary Economic Assessment (“PEA”) for its Hombre Muerto North Lithium Project (“HMN Lithium Project”) near Salta, Argentina. The PEA was prepared by Knight Piésold Consulting (“KP”) and JDS Energy and Mining (“JDS”), both of Vancouver, in accordance with the standards set out in National Instrument 43-101 Standards of disclosure for Mineral Projects (“NI 43-101”), and CIM’s Best Practice Guidelines for Mineral Processing (“BPGMP”).

Read more at prnewswire.com

Related news for (LISMF)

NASDAQ and NYSE quotes and data are delayed 15 minutes unless indicated otherwise. Market data and exchange information are provided for informational purposes only and is not intended for trading purposes. Neither 24/7 Market News Editors, 247 Market News, or data and content providers shall be liable for any errors or omissions, delays, misquotes or other market information relayed in any press materials. You should Use Realtime data to conduct due diligence before investing or trading, and trading in any stock is risky you could lose all your money.