Integra Announces Oxide Drill Results From DeLamar Stockpile Drill Program: 0.51 g/t Gold Equivalent Over 84 m and 0.49 g/t Gold Equivalent Over 70 m, Demonstrating Proof of Concept for Mineralized Stockpiles
VANCOUVER, British Columbia, Dec. 07, 2022 (GLOBE NEWSWIRE) — Integra Resources Corp. (“Integra” or the “Company”) (TSX-V: ITR; NYSE American: ITRG) is pleased to announce drill results from the DeLamar Project (“DeLamar” or the “Project”) located in southwestern Idaho. The drill results announced today are the first ten drill holes from the 11,000 m stockpile drill program at DeLamar. This drill program will test a portion of the estimated 60 Mt of low-grade stockpiled mineralized material at the DeLamar and Florida Mountain deposits, resulting in better understanding of resource potential and grade variability.
Related news for (ITRG)
- integra resources and florida canyon gold transaction receives voting support from strategic shareholder alamos gold
- Integra Announces Additional Oxide Drill Results From Stockpile Drilling Program at DeLamar, Including 0.67 g/t AuEq Over 81 m and 0.58 g/t AuEq Over 49 m
- Integra Intersects 0.74 G/T AuEq Over 38 M and 0.50 G/T AuEq Over 79 at DeLamar, 0.67 G/T AuEq Over 58 M at Florida Mountain in Stockpile Drill Program, Expanding The Potential Heap Leach Oxide Resource at DeLamar
- Integra Announces Drill Results From DeLamar Project: 108.8 M Grading 0.79 G/T Gold Equivalent at Florida Mountain and 48.8 M Grading 0.73 G/T Gold Equivalent at BlackSheep