FREEMAN IMPROVES AVERAGE GOLD RECOVERIES TO 96.9% AND LEACH CIRCUIT TIME BY 50% FOR THE LEMHI GOLD DEPOSIT, IDAHO
Freeman has recently received metallurgical results from tests conducted on two composite samples by Base Metallurgical Laboratories Limited, Kamloops, in conjunction with Ausenco Engineering Canada Ltd. The final metallurgical flowsheet resulted in significant cost savings and operational efficiencies. These include:
Related news for (FMANF)
- FREEMAN COMMENCES PERMITTING INITIATIVES AT THE LEMHI GOLD DEPOSIT, IDAHO
- FREEMAN FILES PRELIMINARY ECONOMIC ASSESSMENT TECHNICAL REPORT FOR LEMHI GOLD PROJECT
- FREEMAN ANNOUNCES ROBUST MAIDEN PRELIMINARY ECONOMIC ASSESSMENT FOR LEMHI: AFTER TAX NPV OF US$ 212 MILLION
- FREEMAN REPORTS 2023 SHAREHOLDER MEETING RESULTS