CYPRESS DEVELOPMENT PROVIDES PROGRESS UPDATE ON FEASIBILITY STUDY AND LITHIUM EXTRACTION FACILITY
TSXV: CYP| OTCQX: CYDVF
VANCOUVER, BC, Jan. 23, 2023 /PRNewswire/ – Cypress Development Corp. (TSXV: CYP) (OTCQX: CYDVF) (Frankfurt: C1Z1) (“Cypress” or “the Company”) is pleased to provide a progress update on its ongoing Feasibility Study being conducted on the Company’s Clayton Valley Lithium Project (“Project”) near Silver Peak, Nevada, and on its operational Lithium Extraction Facility (“Pilot Plant”) in Amargosa Valley, Nevada.
Related news for (CYDVF)
- CENTURY LITHIUM PRODUCES LITHIUM HYDROXIDE AT DEMONSTRATION PLANT IN NEVADA
- CENTURY LITHIUM PROGRESS ON PERMITTING AT ANGEL ISLAND
- CENTURY LITHIUM’S ANGEL ISLAND ADDED TO FAST-41 TRANSPARENCY STATUS
- CENTURY LITHIUM REPORTS BATTERY-GRADE LITHIUM METAL ANODES PRODUCED FROM ANGEL ISLAND LITHIUM CARBONATE
- CENTURY LITHIUM COMMENDS FIRST PHOSPHATE IN MAKING LFP BATTERY CELLS USING CENTURY LITHIUM MATERIAL