Consolidated Lithium Announces Vallée JV Intersects 1.04% Li2O over 7.15 m
TORONTO, Feb. 15, 2024 (GLOBE NEWSWIRE) — Consolidated Lithium Metals Inc. (TSXV: CLM | OTCQB: JORFF | FRA: Z36) (“CLM” or the “Company“) is pleased to announce that joint venture partner North American Lithium, Sayona Mining Inc.’s majority-owned subsidiary, (“NAL”) has reported to the Company the final set of assay results from the last 40 holes of the 2023 summer drilling program at the Vallée joint venture (the “Vallée JV”) lithium project, located approximately 30 km north of Val-d’Or, Quebec within the heart of the Vallée Lithium Corridor (see Figure 1). The 2023 summer drilling program consisted of 58 holes totaling 15,607 m. CLM released the results of the first 18 holes in its news release dated January 11, 2024, which is available under the Company’s SEDAR+ profile at www.sedarplus.ca.