Brixton Metals Provides Initial Assays from the 2024 Drill Program at its Thorn Project with 1467.73m of Copper-Gold-Silver-Molybdenum with Several Sub-intervals:

VANCOUVER, British Columbia, July 25, 2024 (GLOBE NEWSWIRE) — Brixton Metals Corporation (TSX-V: BBB, OTCQB:BBBXF) (the “Company” or “Brixton”) is pleased to announce its first drill results of the 2024 season from its wholly owned Thorn Project located in NW British Columbia, Canada. The 2880 square-kilometer claim group is located within the traditional territory of the Tahltan First Nation and the Taku River Tlingit First Nation. The Thorn Project is an underexplored copper-gold porphyry district with 16 large scale exploration target areas identified. Brixton is currently drilling with two rigs until the end of the season. Ground MT geophysical surveys at the North Copper Target and Cirque Copper Target are now complete and geochemical surveys, prospecting and mapping are ongoing.

Read more at globenewswire.com

Related news for (BBBXF)

NASDAQ and NYSE quotes and data are delayed 15 minutes unless indicated otherwise. Market data and exchange information are provided for informational purposes only and is not intended for trading purposes. Neither 24/7 Market News Editors, 247 Market News, or data and content providers shall be liable for any errors or omissions, delays, misquotes or other market information relayed in any press materials. You should Use Realtime data to conduct due diligence before investing or trading, and trading in any stock is risky you could lose all your money.