American Pacific Reports Most Significant Copper Drill Intersections To-Date at Its Palmer VMS Project, Including 43.8 Metres of 6.54% and 23.9 Metres of 9.03% Copper
VANCOUVER, British Columbia, Jan. 10, 2024 (GLOBE NEWSWIRE) — American Pacific Mining Corp (CSE: USGD / OTCQX: USGDF / FWB: 1QC) (“American Pacific” or the “Company”) is pleased to report the third and final batch of assay results from the 2023 resource definition and geotechnical drill programs at the Palmer Project (“Palmer” or the “Project”). Palmer is an advanced-stage, high-grade volcanogenic massive sulphide-sulphate deposit (“VMS”) located in the Porcupine Mining District of the Haines Borough, Alaska, USA. Constantine North Inc., a subsidiary of American Pacific, is the operator for the Project and the ~US$20 million 2023 program was funded by joint venture (“JV”) partner Dowa Metals & Mining Co., Ltd (“Dowa”).
Related news for (USGDF)
- American Pacific Regains 100% Interest in the Madison Copper-Gold Mine Project in Montana, USA
- REPEAT – American Pacific Reports Most Significant Copper Drill Intersections To-Date at Its Palmer VMS Project, Including 43.8 Metres of 6.54% and 23.9 Metres of 9.03% Copper
- American Pacific Receives Permit To Drill High-Grade Madison Copper Gold Project In Montana
- American Pacific Mining Reports up to 100 g/t Gold and 1,305 g/t Silver from 2023 Rock Chip Sampling at the Recently Expanded Tuscarora Project