Sitka Gold Commences 15,000 Metre Diamond Drilling Program at its Flagship RC Gold Project in Yukon
VANCOUVER, BC, March 5, 2024 /PRNewswire/ – Sitka Gold Corp. (“Sitka” or the “Company”) (TSXV: SIG) (FSE: 1RF) (OTCQB: SITKF) is pleased to announce that diamond drilling has commenced at the Company’s year-round road accessible RC Gold Project (“RC Gold” or the “Project”) located in the prolific Tombstone Gold Belt approximately 100 kilometres east of Dawson City, Yukon. Up to 15,000 metres of diamond drilling across winter and summer drilling campaigns is planned for 2024.
Related news for (SITKF)
- Sitka Gold Intersects 25.0 Meters of 5.04 g/t Gold, Including 1.8 Metres of 54.70 g/t Gold Within 86.4 m of 1.65 g/t Gold at Its RC Gold Project, Yukon
- Sitka Gold Intersects 108.9 Metres of 3.27 g/t Gold Including 45.0 Metres of 4.52 g/t Gold Within 352.8 Metres of 1.55 g/t Gold at Its RC Gold Project, Yukon
- Sitka Gold Appoints Gilles Dessureau as Vice President of Exploration and Strengthens Its Technical Advisory Team
- Sitka Gold Signs 30,000 Metre Diamond Drilling Contract for 2025 at Its RC Gold Project, Yukon
- Sitka Announces $3 Million Private Placement Financing