Newcore Gold Files Technical Report for the Updated Preliminary Economic Assessment for the Enchi Gold Project, Ghana
VANCOUVER, British Columbia, June 07, 2024 (GLOBE NEWSWIRE) — Newcore Gold Ltd. (“Newcore” or the “Company”) (TSX-V: NCAU, OTCQX: NCAUF) reports it has filed the technical report supporting the positive results from the independent, updated Preliminary Economic Assessment (“PEA”) completed for the Company’s 100%-owned Enchi Gold Project (“Enchi” or the “Project”) in Ghana. The PEA was led by Lycopodium Minerals Canada Limited (“Lycopodium”) of Toronto, Canada and was prepared in accordance with National Instrument 43-101 (“NI 43-101”) Standards of Disclosure for Mineral Projects. The technical report, titled “NI 43-101 Technical Report, Preliminary Economic Assessment on the Enchi Gold Project, Ghana” has an effective date of April 24, 2024 and is available under the Company’s profile on SEDAR+ at www.sedarplus.ca.
Related news for (NCAUF)
- Newcore Gold Drilling Intersects 4.41 g/t Gold over 24.0 Metres, including 9.08 g/t Gold over 10.0 Metres, at the Enchi Gold Project, Ghana
- Newcore Gold Drilling Intersects 2.25 g/t Gold over 56.0 Metres from 96 Metres and 1.16 g/t Gold over 72.0 Metres from 104 Metres at the Enchi Gold Project, Ghana
- Newcore Gold Drilling Intersects 2.50 g/t Gold over 15.0 Metres and 3.00 g/t Gold over 10.0 metres at the Enchi Gold Project, Ghana
- Newcore Gold Drilling Intersects 0.73 g/t Gold over 68.0 Metres and 1.39 g/t Gold over 24.0 metres at the Enchi Gold Project, Ghana
- Newcore Gold Increases Drill Program to 35,000 Metres and Intersects 1.28 g/t Gold over 63.0 Metres at the Enchi Gold Project, Ghana