Liberty Gold Reports Phase 4 Metallurgical Column Leach Results and Final Phase 5 Metallurgical Drill Assays at its Black Pine Oxide Gold Project, Idaho
VANCOUVER, British Columbia, March 14, 2024 (GLOBE NEWSWIRE) — Liberty Gold Corp. (TSX:LGD; OTCQX: LGDTF) (“Liberty Gold” or the “Company”) is pleased to report results from Phase 4B and 4C metallurgical bottle roll and column testing of gold mineralization in 36 variability composites taken from the Black Pine Oxide Gold Project (“Black Pine”) in southeastern Idaho. Additionally, final assay results are released on the remaining 4 metallurgical core holes drilled in 2023 to provide samples for the Phase 5 metallurgical test program.
Related news for (LGDTF)
- RETRANSMISSION: BTV Spotlights Top Mining Stocks: Asante Gold, Thesis Gold, US Gold, Bunker Hill, Rua Gold, Liberty Gold & Equinox Gold
- Liberty Gold Reports Q1 2025 Financial and Operating Results
- Liberty Gold Commences 40,000 Meter Feasibility Drill Program and Bulk Metallurgical Sampling at the Black Pine Oxide Gold Project, Idaho
- Liberty Gold Announces the Retirement of Cal Everett, CEO & Director and the Appointment of Dr. Jon Gilligan as new President and Chief Executive
- Liberty Gold Closes C$23 Million Bought Deal Public Offering