Expanded IP Surveys Outline an Additional 600m Strike Length to the Major Mineralized Corridor at Eloro Resources’ Iska Iska Project, Potosi Department, Southwestern Bolivia

TORONTO, Jan. 29, 2024 (GLOBE NEWSWIRE) — Eloro Resources Ltd. (TSX:ELO; OTCQX: ELRRF; FSE: P2QM) is pleased to announce that an expanded induced polarization/resistivity (IP/Res) survey now covers most of the Iska Iska Project, Potosi Department, Southwestern Bolivia. East-west lines have been completed every 200m across and southeast of the Santa Barbara mineral resource using a deep-penetrating array of 50m and offset 100m dipoles to obtain a depth of investigation approaching 400m. The new array and lower surface elevations make it possible to image mineralization at elevations below 3600m in an extension beyond the open southeastern side of the pit that defines the initial mineral resource estimate (“MRE”) (see Eloro press release dated October 17, 2023). In this survey, chargeability highs across the volume already drilled for the Santa Barbara MRE coincide with peaks in the grade of the polymetallic Ag-Zn-Pb mineralization expressed as silver equivalent.

Read more at globenewswire.com

Related news for (ELRRF)

NASDAQ and NYSE quotes and data are delayed 15 minutes unless indicated otherwise. Market data and exchange information are provided for informational purposes only and is not intended for trading purposes. Neither 24/7 Market News Editors, 247 Market News, or data and content providers shall be liable for any errors or omissions, delays, misquotes or other market information relayed in any press materials. You should Use Realtime data to conduct due diligence before investing or trading, and trading in any stock is risky you could lose all your money.