Brixton Metals Drills 76.50m of 1.08 g/t Gold within 179.50m of 0.51 g/t Gold and 54.00m of 1.03 g/t Gold within 149.00m of 0.55 g/t Gold at its Trapper Target on the Thorn Project
VANCOUVER, British Columbia, Dec. 01, 2023 (GLOBE NEWSWIRE) — Brixton Metals Corporation (TSX-V: BBB, OTCQB:BBBXF) (the “Company” or “Brixton”) is pleased to announce the final batch of 2023 drill results from the Trapper Gold Target at its wholly owned Thorn Project. The project is located in Northwest British Columbia, 90km east of Juneau, Alaska and within the Taku River Tlingit and Tahltan First Nation’s traditional territory.
Related news for (BBBXF)
- Brixton Metals Commences Drilling at its Thorn Copper-Gold Project
- Brixton Metals Provides Exploration Plans for Gold and Copper Drill Targets for its Fully Funded 2025 Program at its Thorn Project
- Brixton Metals Provides Results from Ivanhoe Electric’s 2024 Drilling at the Hog Heaven Project, Montana, USA
- Brixton Metals Discovers Multiple Porphyry Systems at the North Target on its Thorn Project
- Brixton Metals Drills 647.83m of 0.49% Copper Equivalent and Discovers a New Gold Zone 8.00m of 4.52 g/t Gold, 149 g/t Silver in the Camp Creek Corridor