Foremost Lithium Confirms 25.92 Metres of Lithium Mineralization Including 1.09% Li2O Across 10 Metres at its Zoro Property, Manitoba Canada
Highlights at the Company’s Maiden Resource at Dyke 1 include:
VANCOUVER, British Columbia, April 08, 2024 (GLOBE NEWSWIRE) — Foremost Lithium Resource & Technology Ltd. (NASDAQ:FMST) (CSE: FAT) (“Foremost Lithium”, “Foremost” or the “Company”), a North American hard-rock lithium exploration company, is pleased today to provide a drilling progress update for its 2024 winter drill program on its Zoro Property located in the Snow Lake region of Manitoba. The Company reports that 2 holes targeting Dyke 1 (see figure 1 below) have been completed with assay results confirming lithium mineralization spanning a cumulative length of 25.92m. Highlights in drill holes FL24-009 and FL24-010 include 1.52% Li2O over 5.02 m and 1.09% Li2O over 9.88 m. Dyke 1 hosts the Company’s maiden inferred resource of 1,074,567 tons at a grade of 0.91% Li2O, with a cut-off grade of 0.3%, as outlined in the Company’s filed Regulation SK-1300 Technical Report Summary (2023) and NI-43-101 Technical Report (2018).